Part Details for EBCL-4-04 by Samtec Inc
Results Overview of EBCL-4-04 by Samtec Inc
- Distributor Offerings: (3 listings)
- Number of FFF Equivalents: (0 replacements)
- CAD Models: (Request Part)
- Number of Functional Equivalents: (0 options)
- Part Data Attributes: (Available)
- Reference Designs: (Not Available)
Tip: Data for a part may vary between manufacturers. You can filter for manufacturers on the top of the page next to the part image and part number.
Price & Stock for EBCL-4-04
Part # | Distributor | Description | Stock | Price | Buy | |
---|---|---|---|---|---|---|
DISTI #
612-EBCL-4-04-ND
|
DigiKey | VERTICAL LATCHING SHROUD FOR EXA Lead time: 6 Weeks Container: Bulk | Temporarily Out of Stock |
|
Buy Now | |
DISTI #
EBCL-4-04
|
Avnet Americas | Vertical Latching Shroud for ExaMAX Backplan - Bulk (Alt: EBCL-4-04) RoHS: Compliant Min Qty: 1 Package Multiple: 1 Lead time: 111 Weeks, 0 Days Container: Bulk | 0 |
|
RFQ | |
DISTI #
EBCL-4-04
|
Avnet Americas | Vertical Latching Shroud for ExaMAX Backplan - Bulk (Alt: EBCL-4-04) RoHS: Compliant Min Qty: 1 Package Multiple: 1 Lead time: 111 Weeks, 0 Days Container: Bulk | 0 |
|
RFQ |
Part Details for EBCL-4-04
EBCL-4-04 CAD Models
EBCL-4-04 Part Data Attributes
|
EBCL-4-04
Samtec Inc
Buy Now
Datasheet
|
Compare Parts:
EBCL-4-04
Samtec Inc
Connector Accessory, Shroud,
|
Part Life Cycle Code | Active | |
Ihs Manufacturer | SAMTEC INC | |
Reach Compliance Code | unknown | |
Factory Lead Time | 111 Weeks | |
Assembly Item Name | SHROUD | |
Connector Support Type | CONNECTOR ACCESSORY | |
DIN Conformance | NO | |
IEC Conformance | NO | |
Insulator Material | POLYAMIDE | |
MIL Conformance | NO | |
Mounting Option 1 | LATCH | |
Mounting Option 2 | LOCKING | |
Used With | BACKPLANE |